The facility features an 80-seat auditorium, community programming spaces, services and facilities, workshop spaces, ICT classrooms, 11 meeting spaces, and a cafe.
Involved from the initial design stage, A.G. Coombs Advisory led the commissioning planning phase and undertook design-for-commissionability reviews. A key commissioning activity for this project included pressure testing of the Library’s sub-floor air displacement system. Pressure testing is required to confirm that all sub-floor plenums are sufficiently sealed. A successful outcome from the testing was achieved with the Library now functioning with reduced air leakage, which will lead to increased energy efficiency and operational savings.
Another key commissioning activity involved detailed testing of the Building Management & Controls System including meter calibration to ensure accurate readings. This has led to system improvements and optimal operational efficiency.
Project Name: Melton Library and Learning Hub
Location: VIC
Client: Melton City Council
Year Completed: 2014
ICA Services

June 26, 2026 in News
World Refrigeration Day 2026 will focus on the essential role of cooling and sustainable heating through this year’s global theme — Cool Intellige...

June 23, 2026 in News
International Women in Engineering Day (INWED), celebrated globally on 23 June, recognises the achievements and contributions of women engineers while...

June 11, 2026 in News
In the complex world of modern construction, where buildings are created with sophisticated technical ecosystems of interconnected services, one criti...

June 10, 2026 in News
Rakesh Ravichandran, Senior Engineer at A.G. Coombs Advisory, will co-present alongside Danielle Rostan-Herbert, Associate Director, Facilities Manage...