
April 1, 2026 in News
Making Electrical Waves – Presbyterian Ladies’ Coll...
When the founders of the Presbyterian Ladies’ College (PLC) welcomed the first cohort of 60 students to their East Melbourne school in 1875, they co...
A.G. Coombs Projects undertook the air conditioning and mechanical services works on this project.
The installation had to take into account the facility’s age and original design peculiarities, such as its round shape (and the associated physical restraints of the building and its structure), and its heritage features, such as the gold leaf ceilings.
Acoustics was a major challenge. A displacement ventilation air conditioning system was installed, offering a number of advantages – they are intrinsically quiet, effective for seated audiences and require less energy as the air rises of its own accord.
A.G. Coombs Service and Walker Fire Protection now maintain the air conditioning and fire protection systems to support the seamless operation of the renewed facility.
Project Name: Hamer Hall
Location: VIC
Client: Baulderstone
Project Value: $8.7m
Year Completed: 2012
Construction – Redevelopment (Air conditioning and mechanical services, design, installation and commissioning, maintenance)

April 1, 2026 in News
When the founders of the Presbyterian Ladies’ College (PLC) welcomed the first cohort of 60 students to their East Melbourne school in 1875, they co...

March 19, 2026 in News
In the traditionally male-dominated building services industry, A.G. Coombs Group is writing a new narrative – one where diversity and inclusion is ...

March 13, 2026 in News
Partnering with First Peoples’ Health and Wellbeing, Nairm Marr Djambana and Bunurong Land Council Aboriginal Corporation, the community will gather...

March 12, 2026 in News
Data Driven Maintenance will take centre stage at AIRAH’s HVAC26 Conference, with A.G. Coombs’ National Data Driven Maintenance (DDM) and Analytic...