
June 10, 2026 in News
Rakesh Ravichandran to co-present with University of Me...
Rakesh Ravichandran, Senior Engineer at A.G. Coombs Advisory, will co-present alongside Danielle Rostan-Herbert, Associate Director, Facilities Manage...
A.G. Coombs Projects undertook the air conditioning and mechanical services works on this project.
The installation had to take into account the facility’s age and original design peculiarities, such as its round shape (and the associated physical restraints of the building and its structure), and its heritage features, such as the gold leaf ceilings.
Acoustics was a major challenge. A displacement ventilation air conditioning system was installed, offering a number of advantages – they are intrinsically quiet, effective for seated audiences and require less energy as the air rises of its own accord.
A.G. Coombs Service and Walker Fire Protection now maintain the air conditioning and fire protection systems to support the seamless operation of the renewed facility.
Project Name: Hamer Hall
Location: VIC
Client: Baulderstone
Project Value: $8.7m
Year Completed: 2012
Construction – Redevelopment (Air conditioning and mechanical services, design, installation and commissioning, maintenance)

June 10, 2026 in News
Rakesh Ravichandran, Senior Engineer at A.G. Coombs Advisory, will co-present alongside Danielle Rostan-Herbert, Associate Director, Facilities Manage...

June 4, 2026 in News
National Reconciliation Week (NRW) provides an important opportunity to reflect on our shared histories and cultures, and to consider how we can colle...

June 3, 2026 in News
As National Reconciliation Week 2026 begins, A.G. Coombs is proud to share a new video reflecting on the launch of Murrungar at the Melbourne Cricket....

May 28, 2026 in News
A.G. Coombs proudly supported the 2026 Walk for Truth as part of its Innovate Reconciliation Action Plan — contributing to a five-week, 800+ kilomet...