
June 26, 2026 in News
World Refrigeration Day 2026 highlights ‘Cool Intelli...
World Refrigeration Day 2026 will focus on the essential role of cooling and sustainable heating through this year’s global theme — Cool Intellige...
A.G. Coombs Projects undertook the air conditioning and mechanical services works on this project.
The installation had to take into account the facility’s age and original design peculiarities, such as its round shape (and the associated physical restraints of the building and its structure), and its heritage features, such as the gold leaf ceilings.
Acoustics was a major challenge. A displacement ventilation air conditioning system was installed, offering a number of advantages – they are intrinsically quiet, effective for seated audiences and require less energy as the air rises of its own accord.
A.G. Coombs Service and Walker Fire Protection now maintain the air conditioning and fire protection systems to support the seamless operation of the renewed facility.
Project Name: Hamer Hall
Location: VIC
Client: Baulderstone
Project Value: $8.7m
Year Completed: 2012
Construction – Redevelopment (Air conditioning and mechanical services, design, installation and commissioning, maintenance)

June 26, 2026 in News
World Refrigeration Day 2026 will focus on the essential role of cooling and sustainable heating through this year’s global theme — Cool Intellige...

June 23, 2026 in News
International Women in Engineering Day (INWED), celebrated globally on 23 June, recognises the achievements and contributions of women engineers while...

June 11, 2026 in News
In the complex world of modern construction, where buildings are created with sophisticated technical ecosystems of interconnected services, one criti...

June 10, 2026 in News
Rakesh Ravichandran, Senior Engineer at A.G. Coombs Advisory, will co-present alongside Danielle Rostan-Herbert, Associate Director, Facilities Manage...