
July 20, 2026 in News
Butler Electrical appointed to deliver services for Aqu...
Butler Electrical has been appointed to deliver electrical, data and communications, solar and electric vehicle charging services for the new Aquatic ...
The world-class facility combines research into infectious disease and immunity with teaching excellence, laboratory diagnostic services, and clinical services.
A.G. Coombs Projects delivered mechanical services to the building, which incorporates everything from complex and highly-specialised containment laboratories and support spaces through to integrated teaching spaces. The team’s integrated prefabrication methodologies benefitted system design, coordination and performance improvements, and have provided easy and safe access provisions for ongoing operation and maintenance.
The complexity and specialist requirements of this facility brought about several key challenges, including the high containment laboratories with their very stringent construction and operational requirements and their need to comply with the Australian Quarantine and Inspection Service (AQIS). Everything was made one hundred percent air tight with all services connections tightly sealed, and all systems were carefully commissioned and tested to exacting standards. Steam plant was installed to assist with air conditioning humidification and medical equipment, and the Doherty’s new HVAC systems are ensuring that temperature and humidity levels are closely set to support critical areas.
Project Name: Peter Doherty Institute (The Doherty, PDI)
Location: VIC
Client: Brookfield Multiplex
Project Value: $31m
Year Completed: 2013
Design & construction – new build (design, installation and commissioning, specialist HVAC and mechanical services, prefabrication)

July 20, 2026 in News
Butler Electrical has been appointed to deliver electrical, data and communications, solar and electric vehicle charging services for the new Aquatic ...

July 20, 2026 in Advisory Notes
Building Management and Control Systems (BMCS) underpin the reliable and safe operation of commercial and institutional buildings. The technology cont...

July 15, 2026 in Our Experience
Strengthening cooling resilience and operational flexibility within a live healthcare environment.

July 10, 2026 in News
The feature explores how Murrungar is creating new pathways for Aboriginal participation in the building services sector.