
August 11, 2026 in News
Creating lasting social value through accessibility, sh...
A.G. Coombs is proud to announce our partnership with Guide Dogs Victoria, further strengthening our commitment to inclusion, accessibility and positi...
A.G. Coombs was appointed as Head Contractor to deliver the John Cade Building Central Plant Node and Clinical Services Building Central Plant Node upgrades, and to manage the associated complexities of working within a live operating environment.
The rebuild incorporated the supply, installation and commissioning of a new heating hot water system consisting of two 2200kW steam to water heat exchangers and two 4000kW gas fired low temperature hot water heaters.
A.G. Coombs was also responsible for the chilled and condenser water, steam, natural gas, condensate, and domestic hot and cold water systems in the John Cade Building Central Plant Node. In the Clinical Services Building Central Plant Node, A.G. Coombs undertook an upgrade of the condenser and chilled water pipework, electrical and Building Management Systems.
Following the plant upgrade was a total rebuild of the Emergency Department’s air conditioning system, including the installation of multiple air handling units, medical gases, isolation rooms, triage, seven separate plant rooms and a two-storey administration wing. A.G. Coombs also assisted with a generator upgrade.
Project handover was staged over a period of 2.5 years, with the hospital remaining fully operational at all times.
Project Name: Royal Melbourne Hospital
Location: VIC
Client: Royal Melbourne Hospital / Leighton
Project Value: $9m
Year Completed: 2010
HVAC & mechanical plant & system upgrades

August 11, 2026 in News
A.G. Coombs is proud to announce our partnership with Guide Dogs Victoria, further strengthening our commitment to inclusion, accessibility and positi...

August 6, 2026 in News
A.G. Coombs Group was proud to play a significant role in FM Connect 26, the Facility Management Association of Australia's (FMA) premier national con...

July 20, 2026 in News
Butler Electrical has been appointed to deliver electrical, data and communications, solar and electric vehicle charging services for the new Aquatic ...

July 20, 2026 in Advisory Notes
Building Management and Control Systems (BMCS) underpin the reliable and safe operation of commercial and institutional buildings. The technology cont...