
June 26, 2026 in News
World Refrigeration Day 2026 highlights ‘Cool Intelli...
World Refrigeration Day 2026 will focus on the essential role of cooling and sustainable heating through this year’s global theme — Cool Intellige...
A.G. Coombs was appointed as Head Contractor to deliver the John Cade Building Central Plant Node and Clinical Services Building Central Plant Node upgrades, and to manage the associated complexities of working within a live operating environment.
The rebuild incorporated the supply, installation and commissioning of a new heating hot water system consisting of two 2200kW steam to water heat exchangers and two 4000kW gas fired low temperature hot water heaters.
A.G. Coombs was also responsible for the chilled and condenser water, steam, natural gas, condensate, and domestic hot and cold water systems in the John Cade Building Central Plant Node. In the Clinical Services Building Central Plant Node, A.G. Coombs undertook an upgrade of the condenser and chilled water pipework, electrical and Building Management Systems.
Following the plant upgrade was a total rebuild of the Emergency Department’s air conditioning system, including the installation of multiple air handling units, medical gases, isolation rooms, triage, seven separate plant rooms and a two-storey administration wing. A.G. Coombs also assisted with a generator upgrade.
Project handover was staged over a period of 2.5 years, with the hospital remaining fully operational at all times.
Project Name: Royal Melbourne Hospital
Location: VIC
Client: Royal Melbourne Hospital / Leighton
Project Value: $9m
Year Completed: 2010
HVAC & mechanical plant & system upgrades

June 26, 2026 in News
World Refrigeration Day 2026 will focus on the essential role of cooling and sustainable heating through this year’s global theme — Cool Intellige...

June 23, 2026 in News
International Women in Engineering Day (INWED), celebrated globally on 23 June, recognises the achievements and contributions of women engineers while...

June 11, 2026 in News
In the complex world of modern construction, where buildings are created with sophisticated technical ecosystems of interconnected services, one criti...

June 10, 2026 in News
Rakesh Ravichandran, Senior Engineer at A.G. Coombs Advisory, will co-present alongside Danielle Rostan-Herbert, Associate Director, Facilities Manage...