
May 28, 2026 in News
Walk for Truth Reaches Canberra — Advancing Conversat...
A.G. Coombs proudly supported the 2026 Walk for Truth as part of its Innovate Reconciliation Action Plan — contributing to a five-week, 800+ kilomet...
Engaged by Property Investment Group, Investa, A.G, Coombs completed Boiler Replacement works located in the Plant Room on level 3 of 567 Collins St.
The existing boiler was originally installed in September 2014 and was showing signs of wear and a reduction in overall reliability and performance.
As a result, A.G. Coombs Advisory were engaged to work closely with Investa and client-side CBRE to produce a Scope of Works for the replacement of the equipment.
A.G. Coombs Advisory started by submitting a detailed Scope of Works for the installation of two (2) condensing water heaters and one (1) modular heater condensing bank to replace the existing heating plant.
Due to the nature of the work and the timing required, CBRE requested to negotiate the construction with A.G. Coombs Projects. An ‘end-to-end’ solution was requested by both CBRE and Investa which A.G. Coombs Advisory and Projects were able to deliver.
Central to the success of this project, A.G. Coombs engaged with the Investa and CBRE to carefully plan the changeover of this critical infrastructure without losing the ability to provide hot water to various systems throughout the building.
The A.G. Coombs Projects team produced a detailed plan for the implementation of the plant changeover and executed that plan without disruption to the building’s operations.
Additional works required as part of the project scope included in the following works:
For more information on this project please contact A.G. Coombs at www.agcoombs.com.au/contact-us/





Project Name: 567 Collins Street - Boiler Replacement
Location: Melbourne, Victoria
Client: Investa and CBRE
Year Completed: 2019
Boiler Replacement

May 28, 2026 in News
A.G. Coombs proudly supported the 2026 Walk for Truth as part of its Innovate Reconciliation Action Plan — contributing to a five-week, 800+ kilomet...

May 27, 2026 in News
Wednesday 27 May marks the beginning of National Reconciliation Week (NRW) 2026, a significant time for all Australians to reflect on our shared histo...

May 26, 2026 in Advisory Notes
Australian Standard AS/NZS 4836:2023 was developed in response to identified risks to workers from electric shock and arc flash. It provides guidance ...

May 25, 2026 in News
We invite our colleagues, partners and industry peers to join us in celebrating the life of Scott Henricksen.