
August 20, 2026 in News
Heritage Meets High Standards — Melbourne Townhall
When Walker Fire Protection was tasked with upgrading the fire sprinkler system at Melbourne’s heritage-listed Town Hall, the project presented ...
June 15, 2022

Andrew Smith, Leader – Building Technologies, A.G. Coombs Advisory
Transitioning today’s modern buildings from construction to operation can be a challenging process. Factor in the interoperability between building systems and the expectation that these sites will perform effectively, efficiently and fault free from day one, and the challenge becomes even greater.
This case study will discuss one such transition of a mixed-use, high-profile Melbourne site and provides real-life examples of utilising both design and operational data to track, maintain, tune and optimise building performance through applying automation analytics, advanced system visualisations, 3D virtual navigation, asset maintenance analytics, and VBIS tagging to provide an end-to-end solution.
The presentation will cover the journey of the facility through its commissioning and handover phases to full operation and discuss the importance of forward planning and system configuration to ensures success when applying analytics. Andrew will look at the roles of the humans in the process of applying and utilising analytics and big data. Analytics can be just noise without the correct interpretation by the right subject matter expert.
Lastly, Andrew will look at how analytic insights can be applied to real-time data from the field, pass through to user interfaces to provide enhanced visualisations, enable automatic fault detection and diagnosis (AFDD) and data driven maintenance (DDM) while linking directly to technical documentation and maintenance records, a convergence of applied technology and data analytics.
For more information on the AIRAH 2022 Big Data and Analytics Forum visit: https://www.airah.org.au/BigData/Default.aspx
For more information on A.G. Coombs’ transition to operate, systems optimisation, operational and asset analytics, and VBIS, contact us at: https://www.agcoombs.com.au/contact-us

August 20, 2026 in News
When Walker Fire Protection was tasked with upgrading the fire sprinkler system at Melbourne’s heritage-listed Town Hall, the project presented ...

August 19, 2026 in News
A.G. Coombs Group was proud to play a significant role in FM Connect 26, the Facility Management Association of Australia's (FMA) premier national con...

August 11, 2026 in News
A.G. Coombs is proud to announce our partnership with Guide Dogs Victoria, further strengthening our commitment to inclusion, accessibility and positi...

August 6, 2026 in News
A.G. Coombs Group was proud to play a significant role in FM Connect 26, the Facility Management Association of Australia's (FMA) premier national con...