
September 21, 2026 in News
Fire Systems Pipe Corrosion Testing Innovation Recognis...
Pipe Thickness Testing, delivered by Walker Fire Protection, has been recognised as a nominee in the 2026 Property Council of Australia (PCA) Innovati...
July 17, 2023

The guide outlines steps to be taken during the design and construction process and offers solutions for common challenges. These include; understanding upfront carbon in buildings, setting targets and getting to zero, measuring reductions, what to do at each stage of the design and construction process and case studies including 25 King Street.
A practical guide to upfront carbon reductions can be downloaded here.
For more information on the award winning 25 King Street project go to King in the North – Brisbane Home to World’s Highest CLT Building and A.G. Coombs Recognised for Project Excellence at 2022 ARBS Industry Awards

September 21, 2026 in News
Pipe Thickness Testing, delivered by Walker Fire Protection, has been recognised as a nominee in the 2026 Property Council of Australia (PCA) Innovati...

September 18, 2026 in News
A.G. Coombs Group was proud to play a significant role in FM Connect 26, the Facility Management Association of Australia's (FMA) premier national con...

September 14, 2026 in News
A.G. Coombs attended the 10th Annual Indigenous Students’ Awards Night hosted by the Indigenous Education and Research Centre at James Cook Universi...

September 10, 2026 in News
Ask R U OK? Any Day – because life happens every day. Life moves quickly – and with it come the ups, downs, and everything...