
May 14, 2026 in News
From Disclosure to Action — Mandatory Climate Report...
Mandatory climate reporting will reshape how organisations understand and respond to climate risk. At the Reshaping Existing Buildings 2026 conference...
July 17, 2023

The guide outlines steps to be taken during the design and construction process and offers solutions for common challenges. These include; understanding upfront carbon in buildings, setting targets and getting to zero, measuring reductions, what to do at each stage of the design and construction process and case studies including 25 King Street.
A practical guide to upfront carbon reductions can be downloaded here.
For more information on the award winning 25 King Street project go to King in the North – Brisbane Home to World’s Highest CLT Building and A.G. Coombs Recognised for Project Excellence at 2022 ARBS Industry Awards

May 14, 2026 in News
Mandatory climate reporting will reshape how organisations understand and respond to climate risk. At the Reshaping Existing Buildings 2026 conference...

May 13, 2026 in News
Held annually as part of the Fire Australia conference and exhibition, Fire Protection Association (FPA) Australia’s prestigious Fire Protection Ind...

May 12, 2026 in News
Signalling a fundamental lift from corporate social responsibility to genuine economic empowerment, A.G. Coombs and its Indigenous partners have launc...

May 11, 2026 in News
A.G. Coombs has been named a finalist in the Major Project Excellence category at the 2026 ARBS Industry Excellence Awards, recognising its contributi...